
Optional items
Key to start,the sewage system integration,cold-start package,after the on-board processing equipment no walking system,fuel oil and water separator,oil filters blocking indicator
Description
1 if the specifications change we will be moving further notice,as soon as possible in order to improve products.
2 cubage flow testing comply with ISO1217 International standards
3 transport weight include all of the liquid,except fuel
|